compacted 3/4 in crushed stone
RecommendedHow many pavers you need
Paver count comes from two numbers: the area to be paved and the face area of one paver. Divide 144, the number of square inches in a square foot, by the paver's face area in square inches and you have pavers per square foot. Multiply by the patio area, add an allowance for cuts, and round up.
Use nominal dimensions. Pavers are made slightly undersize so the joints fit inside the nominal grid, which is why a 4 x 8 holland stone counts as 4.5 pavers per square foot.
A worked example
A 12 by 10 ft patio is 120 square feet. A 4 x 8 inch paver covers 32 square inches, and 144 divided by 32 is 4.5 pavers per square foot. 120 x 4.5 is 540 pavers. Laid in running bond, a 10 percent cut allowance takes that to 594 pavers. Laid in herringbone, the 15 percent allowance takes it to 621.
Why the laying pattern changes the count
Every pattern needs cut pieces where it meets the edge of the patio, and the number of cuts depends on the pattern. Running bond and stack bond run parallel to the edges, so only the last row on each side is cut. Basket weave behaves much the same. Herringbone and any pattern laid on a diagonal meet every edge at an angle, so every edge paver is a cut piece and more of each cut piece is wasted. That is why the usual allowance is 10 percent for straight patterns and 15 percent for herringbone and diagonal work. Curved borders, circles and lots of obstacles such as posts or drains justify going higher.
Herringbone is worth the extra pavers on a driveway. The interlocking zig zag resists the sideways push of turning tyres far better than running bond, which is why it is the standard pattern for anything that carries vehicles.
The base: where most patios fail
A paver surface is flexible. It relies entirely on the compacted gravel underneath to carry load and drain water. A thin or poorly compacted base is the reason pavers sink, rock and grow weeds within a few seasons.
The base is dense graded crushed stone, often sold as crusher run, road base or 3/4 inch minus, which has enough fines to lock together when compacted. Spread it in layers of 2 to 4 inches and run a plate compactor over each layer, rather than dumping the full depth and compacting once. Loose stone compacts by roughly 15 percent or more, so the calculator adds 15 percent to the base volume. At about 1.4 tons per cubic yard, the 12 by 10 ft patio at 4 inches needs 1.70 cubic yards, about 2.4 tons.
Bedding sand
The pavers sit on a 1 inch layer of coarse concrete sand, screeded flat between two pipes. It is not compacted before the pavers go down; the plate compactor seats the pavers into it afterwards. Do not use stone dust or play sand for this layer. Fine material holds water and lets pavers shift. The calculator adds 10 percent to the sand volume for the screeding and edges.
How deep to dig
Excavation depth is the base depth plus 1 inch of sand plus the paver thickness. A patio with a 4 inch base and 2 3/8 inch pavers needs about 7 3/8 inches of digging below the finished surface. Build in a fall of about 1/4 inch per foot away from the house so water runs off rather than toward the foundation, which is about 2 1/2 inches over a 10 ft patio.
Joints and edges
Once the pavers are laid and compacted, polymeric sand is swept into the joints and lightly wetted. It hardens enough to lock the pavers together and resist ants and weeds while staying flexible. Coverage depends heavily on joint width and paver thickness, so treat the bag count as an estimate. Small pavers have far more joint length per square foot and use more sand; large slabs use much less.
The edge restraint holds the whole field together. Without it the outer rows creep outward and the joints open up. Plastic or aluminium paver edging is spiked into the base around the perimeter; a concrete curb or a soldier course set in mortar does the same job. The calculator gives the perimeter as the edging length. Add a little for corners and any curves.
Common mistakes
- Building the base too thin to save money, then losing the whole patio to settling.
- Compacting the full base depth in one pass instead of in layers.
- Using fine sand or stone dust for the bedding layer.
- Leaving out the edge restraint on the side next to a lawn.
- Buying exactly the calculated number of pavers, then finding the store cannot match the colour batch when you run short.
Pavers from different production runs vary in colour. Mix pavers from several pallets as you lay them so any variation is spread evenly, and keep a few spares from the same batch. A cracked paver can be lifted out and replaced years later, and only an exact match will disappear into the surface.