Concrete Driveway Calculator

Calculate cubic yards of ready-mix concrete, truck deliveries, crushed gravel subbase and rebar or wire mesh reinforcement for residential driveways.

✓ Imperial and metric✓ Package size results✓ Private by design
01
Enter your projectDriveway dimensions and slab thickness
Waste allowance10%
0%Recommended 10%20%
02
Your resultUpdates as you type
Concrete volume in cubic yards 0

80 lb bags0

if mixing on-site

Gravel subbase0

compacted road base

Buy this0

Rounded up to whole packages.

Driveway surface area0
Exact volume0
Volume with waste0
Reinforcement needed0
Total ready-mix order0
How this was calculated
Advertisement

Engineering a long-lasting concrete driveway

A residential concrete driveway is an investment built to endure tens of thousands of pounds of rolling vehicle weight, seasonal freeze-thaw cycles, and ground movement. Estimating materials accurately requires calculating the slab volume, the subbase gravel pad, and steel reinforcement grid.

Concrete volume is sold and delivered in cubic yards (27 cubic feet). Ready-mix suppliers blend cement, sand, coarse aggregate and water, delivering it in rotating drum mixer trucks carrying 9 to 10 cubic yards per trip. Ordering ready-mix is substantially cheaper and produces far superior structural strength (typically 3,500 to 4,000 PSI) compared to hand-mixing hundreds of 80-pound dry bags.

The formulaCubic Yards = (Length ft x Width ft x Thickness ft) / 27 + 10% Waste

Order ready-mix in 1/4 cubic yard increments. Gravel Subbase Tons = (Area sq ft x Base Depth ft / 27) x 1.4 tons/yd3.

A worked driveway example

Suppose you are pouring a standard two-car driveway measuring 40 feet long by 18 feet wide at 4 inches thick with a 4-inch crushed gravel subbase and #4 rebar reinforcement.

  • Driveway surface area: 40 feet x 18 feet = 720 square feet.
  • Thickness in feet: 4 inches / 12 = 0.3333 feet.
  • Net volume: 720 sq ft x 0.3333 ft = 240 cubic feet.
  • Net cubic yards: 240 / 27 = 8.89 cubic yards.
  • With 10% waste allowance: 8.89 x 1.10 = 9.78 cubic yards.
  • Ready-mix order: Order 10.0 cubic yards (1 full mixer truck load).
  • Gravel subbase: 720 sq ft x (4/12 ft) / 27 = 8.89 cu yd x 1.4 = 12.4 tons crushed road base.
  • Rebar grid: #4 rebar spaced 18 inches on-center requires approximately 53 sticks of 20-foot rebar with laps.

Driveway thickness guide: 4 in vs 5 in vs 6 in

Selecting the right slab thickness depends directly on intended vehicle weight:

ThicknessVehicle Weight CapacityRecommended UseTypical Reinforcement
4 inchesUp to 5,000 lb vehiclesSedans, compact cars, light crossovers6x6 Welded wire mesh or #3 rebar at 24 in
5 inchesUp to 8,000 lb vehiclesFull-size SUVs, half-ton pickups, minivans#4 rebar at 18 in on-center
6 inchesOver 10,000 lb vehiclesHeavy commercial trucks, RVs, equipment trailers#4 rebar at 12 to 16 in grid on chairs

Expansion joints and control joints

Concrete shrinks as it cures and expands with summer heat. Without planned joints, it will crack randomly. Contraction control joints should be tooled or saw-cut to a depth of one-quarter the slab thickness (1 inch deep for a 4-inch slab). Space control joints in square panels with maximum spacing of 2 to 2.5 times the slab thickness in feet (a 4-inch slab needs joints spaced 8 to 10 feet apart). Full-depth isolation expansion joints (1/2-inch thick asphalt or foam strips) must be placed wherever the driveway meets the garage slab, sidewalk, or street curb.

Common mistakes in driveway construction

  • Pouring without a compacted gravel base. Pouring concrete over soft topsoil or clay causes subgrade settlement and early cracking. Always compact 4 to 6 inches of crushed stone first.
  • Ordering exact calculated concrete yardage. Variations in subgrade depth, form deflection and spillage mean you will run short. Always order 10% extra. Running short on a concrete truck pour results in cold joints.
  • Letting rebar sit on the ground. Steel reinforcement must sit in the upper half or middle third of the slab to resist tensile stress. Use plastic chairs or concrete dobies to hold rebar 2 inches off the gravel.
  • Adding excessive water on-site. Adding hose water to make concrete easier to pull weakens the compressive PSI rating and causes surface scaling and dusting.

Standard concrete driveway dimensions and yardage

Pre-calculated ready-mix concrete requirements (with 10% waste) for popular single-car, two-car and commercial driveway sizes:

Driveway Type / SizeArea (Sq Ft)4 in Slab (Cars)5 in Slab (Pickups)6 in Slab (Heavy/RVs)
Single Car 10 x 20 ft200 sq ft2.7 yd3 (1 truck)3.4 yd3 (1 truck)4.1 yd3 (1 truck)
Single Car 10 x 40 ft400 sq ft5.4 yd3 (1 truck)6.8 yd3 (1 truck)8.2 yd3 (1 truck)
Single Car 12 x 50 ft600 sq ft8.1 yd3 (1 truck)10.2 yd3 (2 trucks)12.2 yd3 (2 trucks)
Double Car 18 x 30 ft540 sq ft7.3 yd3 (1 truck)9.2 yd3 (1 truck)11.0 yd3 (2 trucks)
Double Car 20 x 40 ft800 sq ft10.9 yd3 (2 trucks)13.6 yd3 (2 trucks)16.3 yd3 (2 trucks)
Double Car 24 x 50 ft1,200 sq ft16.3 yd3 (2 trucks)20.4 yd3 (3 trucks)24.4 yd3 (3 trucks)
Advertisement
Common questions

Concrete Driveway Calculator FAQ

Straight answers to the questions people ask most about this calculation.

How thick should a concrete driveway be?

A residential concrete driveway should be at least 4 inches thick for standard passenger cars, or 5 to 6 inches thick for heavy pickup trucks, large SUVs, and motorhomes.

How many cubic yards of concrete do I need for a 20x20 driveway?

A 20x20 foot driveway (400 sq ft) at 4 inches thick requires 4.94 cubic yards. Adding 10% waste equals 5.43 cubic yards. Order 5.5 cubic yards from the ready-mix plant.

Is rebar or wire mesh better for a driveway?

#4 (1/2-inch) rebar tied in an 18-inch grid is substantially stronger than welded wire mesh. Wire mesh frequently gets pushed to the bottom of the pour during raking, rendering it ineffective.

How far apart should control joints be placed?

Space control joints at a distance (in feet) no more than twice to 2.5 times the slab thickness in inches. For a 4-inch slab, space joints every 8 to 10 feet apart in square panels.

How much does a ready-mix concrete truck carry?

A standard commercial concrete transit mixer truck holds between 9 and 10 cubic yards of concrete when fully loaded.

How long before I can drive on a new concrete driveway?

You can walk on new concrete after 24 to 48 hours. Wait at least 7 days before parking regular cars on it, and wait 28 days for full design cure before parking heavy trucks or RVs.

Why is a gravel subbase necessary under concrete?

Crushed aggregate provides uniform load support, prevents frost heave in cold climates, and provides drainage so water does not accumulate under the slab.

How many 80 lb bags of concrete make one cubic yard?

It takes 45 bags of 80-pound concrete (or 60 bags of 60-pound concrete) to equal one cubic yard. For driveways over 2 yards, ordering ready-mix delivery is far more economical.

Advertisement
Result 0